Tuesday, March 7, 2017

WEEK 7 (Feb 20 - Feb 26)

With the end of the installation period in sight, the team was finally able to work on the beginning processes of installing the finishing details. Pre-Made vinyl panels were installed on the high points of the walls and ceiling via the lift to carry the pixel effect into the void of the white walls. As a result of commencing the finalizing process, we were finally able to reflect back on the space as a whole and how the shapes ultimately affected and manipulated both the space, and our perception of it.

Archive